Gantt-diagram
From Wikipedia
A Gantt-diagram shows the length of a project as beams on the x-axis of of a time line. This is called ‚Gantt diagram‘. By default the time-axis will be allocated automatically (which means the possible earliest start of a project is a the begin of the time axis and at the end will be the latest possible end of a project), but never the less any start- or end time can be selected.
- Tip: Please be aware to select the radio button hard right sided, for if not, the system will do an automatic scaling. <br<
In case the amount of project gets to much, you have the possibility to select main projects without their sub projects or only one project branch. The display of one pre and and fore of a project is possible, too, as the user selected it.
Image:10000000000001BF0000011E51FBD065.png
The Gantt diagram gives to the timerelated information the information of additionals,
Image:10000000000001D100000104B6EC30F9.png
too. The projects will be displayed according to their current status in different colours. A legend below the graphics explains the colouring.